Getting started, self-hosting, the REST & webhook API, and the scheduling engine internals — maintained right alongside the code.
Read the full documentation at docs.trueppm.com.
Spin up TruePPM, import a project, derive the schedule, and read your first forecast.
Bring a Postgres, run the stack with Docker Compose, and wire up single sign-on (OIDC/OAuth).
Everything the app can do, the API can do — schedules, forecasts, and a webhook on every change.
The standalone critical-path (CPM) + Monte Carlo Python package on PyPI — pip install trueppm-scheduler.
The end-to-end hybrid workflow in plain narrative, plus a guide for each of the eight roles — PM, Scrum Master, product owner, executive, and more.
What's shipped, what's underway, and what's planned through 1.0 — a new release every 3–4 weeks, with 0.4 as the first beta.
Judging TruePPM against your current stack — what to try first, what it does not do yet, and the questions worth asking of any P3M tool.
The engineering practice, with the evidence: what blocks a merge, how the test harness catches its own blind spots, the limits we don't paper over — and the commands to verify every claim yourself.